Skip to main content
buildradar
Sign in
Topic · critical-path-method

critical-path-method

Tracked open-source repos tagged critical-path-method, sorted by stars.

Repos
1
Total stars
535
Avg. stars
535
Share
0.00%

Topics that frequently appear alongside critical-path-method on the same repo.

Recent risers

Repos created in the last 90 days, tagged critical-path-method.

No new repos tagged with this topic in the last 90 days.

  • forge-film@F-R-L

    Multi-model DAG-driven parallel AI film generation — parallel speedup scales with scene independence; Generate film scenes simultaneously instead of one by one; "把影视生成的执行图从拓扑序变成关键路径最优调度" ; 唯一把场景叙事依赖建模为 DAG、以 CPM 算法驱动并行调度的影视生成引擎

    536+0Star change over the last 7 days
← Back to topics