Skip to main content
buildradar
Sign in
Topic · msproject

msproject

Tracked open-source repos tagged msproject, sorted by stars.

Repos
1
Total stars
14,128
Avg. stars
14,128
Share
0.00%

Topics that frequently appear alongside msproject on the same repo.

Recent risers

Repos created in the last 90 days, tagged msproject.

No new repos tagged with this topic in the last 90 days.

  • Office-Tool@YerongAI

    Office Tool Plus localization projects.

    14,128+30Star change over the last 7 days
← Back to topics